Athabasca Basin
Turnor Lake
Red Willow

Hook Lake
Smart Lake
Henday Block

Fire Eye Lake
William River
Umfreville
South Newnham

Turnor Lake Videos


February 2007
Drilling Activity 2007



Uranium Projects  Print This Page    


Turnor Lake

The Turnor Lake Project is 100% owned by Purepoint and includes five claims with a total area of 9,705 hectares situated in the eastern plane of the Athabasca Basin. Depth to the unconformity is shallow at approximately 180 metres.

The property covers known graphitic conductors that are associated with uranium showings on adjoining properties, namely Cameco's La Rocque showing (33.9% U3O8 over 5.5 m) to the west and Areva's HLH-50 intercept (5.2% U3O8 over 0.38 m) located to the south. The project lies in close proximity to several uranium deposits including Midwest Lake, McClean Lake, Eagle Point, and Collins Bay.

Turnor Lake
Project



View | Download
Eastern Athabasca
Basin Projects



View | Download

Turnor Lake Drill Results Summary

Target Zone Max U (cps) Metres Drilled to Date Number of Holes Drilled
Best Hole

U3O8%   Width

>.05% U3O8 over 1m
(of Merit)
>.005% U3O8
(Requires Followup)
<.005% U3O8
Quetzal 2,393 1,446 6 -   - - 2 4
Cotinga  1,247 2,279 8 0.012   0.4 - 3 5
Klaproth Point 6,979 2,432 9 0.052   0.4 1 7 1
Siskin 4,602 2,250 10 0.145   0.1 - 8 2
Klaproth South 1,146 1,894 8 0.035   0.3 - 3 5
Serin 825 354 1 -   - - 0 1
Aris 1,918 538 2 0.065   0.1 - 1 1
Laysan South - n/d - -   - - - -
Anvil South - n/d - -   - - - -
Turnor Lake - n/d - -   - - - -
Total - 11,193 44 -   - 1 24 19
n/d not yet drill tested  n/a - assays not yet availiable



Turnor Lake News


< Prev | 1 | 2 | 3 | Next >
June 1, 2006
 Commences Summer Drill Program at Turnor Lake 

April 26, 2006
 Resource World: Initial Drill Results At Turner Lake Outline Hot New Prospective Zone

April 18, 2006
 Initial Drill Results at Turnor Lake Outline Hottest New Target in Canada’s Athabasca Basin 

February 21, 2006
 Commences Drilling on Turaco Grid at Turnor Lake Project 

January 24, 2006
 Drilling and Exploration Update 

December 28, 2005
 Confirms Local Exploration Field Team for 2006 

August 1, 2005
 Saskatchewan Business Magazine:  Aggressive Drill Plans this Winter

July 27, 2005
 Aggressive Drill Plans in Place for Winter 2005/06 

July 13, 2005
 Third Discovery on Serin Grid at Turnor Lake Significantly Impacts Drill Plans 

July 6, 2005
 New Discovery at Turnor Lake Uncovers Clear Target on Laysan Grid 


Copyright © 2009 Purepoint Uranium Group Inc. All rights reserved. Home | Contact Us | Terms of Use